Insurance broker / Natural hazard cover in Germany (Elementarschadenversicherung) / Policy wording archive
NV Besondere Bedingungen Elementar: the policy wording in full
Besondere Bedingungen WohnhausElementar 2.0 zur NV Wohngebäudeversicherung mit allen Elementargefahren, 4 Wochen Wartezeit, 10 Prozent Selbstbeteiligung (250 bis 5.000 Euro) und gesondertem Kündigungsrecht beider Seiten.
German market: tariffs for people living in Germany.
Done in two minutes: your details are enough, we take care of the rest.
- Free for you, same price as going direct
- 4.98 out of 5 stars from 5,037 reviews
- On your side when you claim
Take out this policy through NAMMERT
You have already worked out with your AI what fits you. All we need now are your details. We pass your application on to NV.
- AI has advised
- 2Your details
- Application to NV
Thank you, we have your application.
We pass it on to NV and get back to you with the confirmation.
Everything about this policy
What the policy covers: 62 points, each with its clause
Basics
| Point | Rule | Wording (German) | Clause |
|---|---|---|---|
| Contract form: add-on to buildings or contents insurance, or stand-alone natural hazards policy | no | „Mit Beendigung der Wohngebäudeversicherung erlischt auch die Versicherung weiterer Elementarschäden.“ | § 14, page 3 |
| Natural hazards cover for the building | yes | „Der Versicherer leistet Entschädigung für versicherte Sachen, die durch“ | § 2, page 2 |
| Natural hazards cover for contents | not addressed | ||
| Indemnity limit for natural hazard losses (full sum insured or separate cap) | as stated in the policy schedule | „Die Versicherungssumme und der Beitrag werden gemäß § 10 und 12 VGB 2008 angepasst.“ | § 15, page 3 |
| Annual aggregate limit for all natural hazard losses in one policy year | not addressed | ||
| All natural perils in one package (no single peril can be deselected) | yes | „Der Versicherer leistet Entschädigung für versicherte Sachen, die durch“ | § 2, page 2 |
| Acceptance by hazard zone (ZÜRS in Germany, HORA in Austria) | yes | „besteht für Objekte in Gebieten mit den nachstehenden Postleitzahlen:“ | § 10 c), page 2 |
Insured perils
| Point | Rule | Wording (German) | Clause |
|---|---|---|---|
| Flooding from overflowing surface waters (river flood) | yes | „Ausuferung von oberirdischen (stehenden oder fließenden) Gewässern;“ | § 3 a) aa), page 2 |
| Flooding from heavy rain (flash flood) away from waters | yes | „Überschwemmung ist die Überflutung des Grund und Bodens des Versicherungsgrundstücks mit erheblichen Mengen von Oberflächenwasser durch“ | § 3 a), page 2 |
| Sewer backflow | yes | „Rückstau liegt vor, wenn Wasser durch Ausuferung von oberirdischen (stehenden oder fließenden) Gewässern oder durch Witterungsniederschläge bestimmungswidrig aus den gebäudeeigenen Ableitungsrohren“ | § 3 b), page 2 |
| Earthquake | yes | „Erdbeben ist eine naturbedingte Erschütterung des Erdbodens, die durch geophysikalische Vorgänge im Erdinnern ausgelöst wird.“ | § 4 a), page 2 |
| Subsidence over natural cavities | yes | „Erdsenkung ist eine Absenkung des Erdbodens über naturbedingten Hohlräumen.“ | § 5, page 2 |
| Landslide, rockfall | yes | „Erdrutsch ist ein naturbedingtes Abrutschen oder Abstürzen von Erd- oder Gesteinsmassen.“ | § 6, page 2 |
| Mudflow (debris flow) | not addressed | ||
| Snow load | yes | „Schneedruck ist die Wirkung des Gewichtes von Schnee- oder Eismassen.“ | § 7, page 2 |
| Avalanches and avalanche blast | yes | „Lawinen sind an Berghängen niedergehende Schnee- oder Eismassen einschließlich der bei ihrem Abgang verursachten Druckwelle.“ | § 8, page 2 |
| Volcanic eruption | yes | „Vulkanausbruch ist eine plötzliche Druckentladung beim Aufreißen der Erdkruste,“ | § 9, page 2 |
| Storm surge | no | „Sturmflut“ | § 10 b) aa), page 2 |
| Rising groundwater caused by flooding or rain | yes | „Austritt von Grundwasser an die Oberfläche infolge von aa) oder bb).“ | § 3 a) cc), page 2 |
| Rain or meltwater entering via roof or walls without prior damage | not addressed | ||
| Further weather perils beyond storm and hail in the natural hazards section | not addressed |
Benefits and costs
| Point | Rule | Wording (German) | Clause |
|---|---|---|---|
| Indemnity at replacement value | not addressed | ||
| Clear-up, demolition and disposal costs, especially mud and debris | not addressed | ||
| Drying costs | not addressed | ||
| Loss of rent or use after a natural hazard loss | not addressed | ||
| Hotel costs if the home is uninhabitable | not addressed | ||
| Costs to avert or mitigate a loss (sandbags, pumping) | not addressed | ||
| Outdoor installations and items outside | not addressed | ||
| Outbuildings, garages and carports | not addressed | ||
| Motor vehicles on the premises excluded | not addressed | ||
| Contents in the basement covered | not addressed | ||
| Emergency measures and temporary protection | not addressed |
Deductible and waiting period
| Point | Rule | Wording (German) | Clause |
|---|---|---|---|
| Deductible per natural hazard loss as fixed amount | yes, up to EUR 250 | „Die Selbstbeteiligung beträgt je Schadenfall 10% der Schadenhöhe, mind. 250 EUR, max. 5.000 EUR.“ | § 16, page 3 |
| Percentage deductible of the loss or sum insured | yes | „Die Selbstbeteiligung beträgt je Schadenfall 10% der Schadenhöhe, mind. 250 EUR, max. 5.000 EUR.“ | § 16, page 3 |
| Higher deductible in high hazard zones | not addressed | ||
| Waiting period from inception for natural hazard losses | yes | „Der Versicherungsschutz beginnt mit dem Ablauf von 4 Wochen ab Versicherungsbeginn (Wartezeit).“ | § 12 a), page 3 |
| Waiting period waived with seamless prior natural hazards cover | yes | „Die Wartezeit entfällt, wenn der Versicherungsbeginn mit dem Versicherungsablauf der Vorversicherung übereinstimmt.“ | § 12 b), page 3 |
| Deductible waived or reduced after claim-free years | not addressed |
Exclusions
| Point | Rule | Wording (German) | Clause |
|---|---|---|---|
| Storm surge excluded | yes | „Sturmflut“ | § 10 b) aa), page 2 |
| Groundwater not linked to flood or rain excluded | yes | „Grundwasser, soweit nicht an die Erdoberfläche gedrungen (siehe § 3)“ | § 10 b) bb), page 2 |
| Exclusion of damp, dry rot and mould as long-term damage | not addressed | ||
| Exclusion for construction defects or poor maintenance | yes | „ungenügende Verdichtung des Untergrundes vor Baubeginn oder fehlerhafte Gründungsvarianten“ | § 5 a), page 2 |
| Exclusion of subsidence from mining or human activity | not addressed | ||
| Exclusion of dam or dyke failure | not addressed | ||
| Exclusion of buildings under construction | yes | „Schäden an versicherten Sachen, die sich in versicherten Gebäuden befinden, die nicht bezugsfertig oder wegen Umbauarbeiten für ihren Zweck nicht benutzbar sind;“ | § 10 a), page 2 |
| Exclusion of events already known or forecast at inception | not addressed |
Obligations
| Point | Rule | Wording (German) | Clause |
|---|---|---|---|
| Backflow valve required | yes | „bei überflutungsgefährdeten Räumen Rückstauklappen anzubringen und funktionsbereit zu halten und“ | § 11 b), page 3 |
| Duty to keep drains, gutters and downpipes clear | yes | „Abflussleitungen auf dem Versicherungsgrundstück freizuhalten, sofern der Versicherungsnehmer hierfür die Gefahr trägt.“ | § 11 c), page 3 |
| Duty to clear snow from roofs | not addressed | ||
| Storage rule: items in basement above minimum height | not addressed | ||
| No reduction for gross negligence | not addressed | ||
| Notification deadline and duty to preserve evidence | not addressed |
Contract
| Point | Rule | Wording (German) | Clause |
|---|---|---|---|
| Natural hazards add-on cancellable separately, also by the insurer after a loss | yes | „Versicherungsnehmer und Versicherer können unter Einhaltung einer Frist von drei Monaten die Versicherung weiterer Elementarschäden in Textform kündigen.“ | § 13 a), page 3 |
| Premium adjustment when the hazard zone changes | none | „Die Versicherungssumme und der Beitrag werden gemäß § 10 und 12 VGB 2008 angepasst.“ | § 15, page 3 |
| Contract term and notice period | not addressed | ||
| Best-terms guarantee against model conditions or prior contract | not addressed | ||
| Innovation clause: future improvements apply automatically | not addressed |
Spain: Consorcio and extra cover
| Point | Rule | Wording (German) | Clause |
|---|---|---|---|
| Reference to extraordinary risks covered by the Consorcio | not addressed | ||
| Own rain cover: from which rainfall intensity | not addressed | ||
| Own wind cover below the Consorcio threshold | not addressed | ||
| Own cover for hail and snow regardless of intensity | not addressed | ||
| Cover of the Consorcio deductible or top-up beyond Consorcio | not addressed |
Evaluated by NAMMERT from published policy wordings. Despite care, a value may be misread; legally only the wording of your own contract in the edition stated there applies. Please report errors, we correct them the same day.
Policy wordings and provider
- Legal entity
- NV-Versicherungen VVaG
- Distribution
- brokers and direct
- Besondere Bedingungen für die Versicherung weiterer Elementarschäden in der Wohngebäudeversicherung (BWWE) Edition: BWWE WohnhausElementar 2.0, 02/2012 Original from the insurer (PDF, German)
Full text of the wording
Converted from the insurer's PDF, page numbers in square brackets. Tables may have shifted; if in doubt, the original applies. As text (Markdown)